Holm House 2

Warsaw, Mokotów, 6, 8, 10 Zdziechowskiego Street

Discover our offer

Send an enquiry
Hello, I’d like some information about the Holm House 2 development and similar projects. Please do get in touch.
+48 22 509 99 99 Mon–Fri 9.00 – 17.00

Number of rooms

Area

m2
m2
1 m2 207 m2

Price per m²

2,494 zł 38,816 zł

Price

962 zł 4,930,170 zł

Floor

Selected filters
Edit filters
All flats

No results

Description

Holm House 2

Holm House 2 apartments form the second phase of the development on Zdziechowskiego Street. The excellent infrastructure in this part of Warsaw, its proximity to the business district, and the use of innovative solutions in the buildings make living here the best investment.

This stage features: 

  • Three buildings – B, C and D
  • A variety of building structures: 8 storeys (Building B) and 6 storeys (Buildings C and D)
  • Tall wooden windows
  • Ceiling heights of approximately 2.7 m, and approximately 3 m on the top floors
  • Internal courtyards and a leisure area exclusively for residents
  • A playground built from safe, certified materials
  • Ground-floor commercial premises along Zdziechowskiego Street
  • Freehold land ownership
  • Buildings certified under the BREEAM environmental assessment system – all Skanska developments are built in accordance with the principles of sustainable construction, ensuring economical, comfortable and responsible living
  • ‘Barrier-Free Facility’ certificate – a minimum number of kerbs and steps make it easier to move around the estate; ramps, threshold-free lifts and lightweight doors ensure easy access to the buildings; and some flats can be adapted to meet the needs of people with various types and degrees of physical, visual or hearing impairments
  • Designed by HRA Architekci, built by the main contractor Skanska SA

 

Project Details
Apartment area 68.57 – 133.45 m²
Number of rooms 3 - 5
Number of floors 8
Commercial premises 2
Completion date Buildings completed

Construction Phases

Sales launch

Sales of flats began in January 2017.

Construction start

Once legal requirements are fulfilled, inspections completed, and design documentation prepared, construction of your new apartment begins. During this stage, the construction site is prepared, building outlines are marked, and excavation for the foundations begins.

‘Zero state’

The moment when the building ‘rises from the ground’. Every day, you’ll be able to watch the work progress and see the floors being added at a rapid pace. Concrete is being poured, and the formwork and reinforcement for the floor slab are being installed.

Shell open stage

In this stage, the building structure and roofing are completed.

Shell closed stage

At this stage, windows have been installed, external walls constructed, and finishing works commence.

Occupancy permit

At this point, construction works on both the buildings and the surrounding grounds are complete. It is time for inspections conducted by, among others, the Fire Brigade, Health and Safety Authority, and the District Building Control Inspectorate (PINB). If there are no objections, the occupancy permit is issued.

Handover

Time to move in! The process of handing over keys to future residents begins.
Location
Filter map
Clear filters

Commercial premises

A smart move for your business

A safe housing estate in Warsaw – Holm House

A new urban district is taking shape in Mokotów. The multi-phase Holm House development will eventually comprise eight buildings and over 800 flats. The first four buildings at 6–8 Zdziechowskiego Street are already occupied – today, nearly 370 families live there. Others are currently under construction, including those near the new town square, with access from the bustling Domaniewska Street.

The prime location of these uniquely designed buildings, combined with the safety of the area, are assets that cannot be overestimated. Skanska – a developer with international experience – is a guarantee of partnership and adherence to the highest standards of sustainable construction.

A large, new residential development in the heart of Mokotów’s business district offers a secure future for your company. This is where your customers live.

A safe housing estate in Warsaw – Holm House
Send an enquiry

    Thank you for your interest in our offer. Please get in touch – we’ll be happy to answer any questions you may have.

    Enquiry details:

    Add items from your Favourites to your enquiry:






    Enquiry sent!

    Thank you, we have received your enquiry. One of our advisers will contact you via the email address or telephone number you have provided.

    OK

    Sales office

    Holm House

    Please feel free to make an appointment to visit our sales office.

    SPARK office block, 173 Solidarności Avenue, Warsaw

    Mon 9.00 – 17.00
    Tue 11.00 – 17.00
    Wed 9.00 – 17.00
    Thu 9.00 – 17.00
    Fri 9.00 – 17.00

    Send an enquiry