Scandinavia is inscribed in the name Skanska – which is why here, you’ll find the essence of the Swedish lifestyle: sustainability, quality, style, and a balance between work and private life. The estate is located on Optyków Street in Praga-Południe, near the Siekierkowska Route and Ostrobramska Street. Residents appreciate it for its excellent transport connections, the proximity of various recreational areas, and its location within the already established social infrastructure of the Gocław neighbourhood.
Two completed buildings: 85 and 125 apartments
Room height of approx. 2.7 m
Varied structure: 6 and 8 storeys
Functional flat layouts, excellent natural light, large windows with white internal frames and wood-effect finish on the exterior
Green courtyards between buildings
Lifts serving all floors of the building, quiet-running, suitable for prams and persons with disabilities
Two-level underground garage with storage units and bicycle lockers, surface parking spaces
Pram room (in building D)
Cohesive, light Scandinavian colour palette and carefully finished buildings
Design by nsMoonStudio, executed by general contractor Skanska SA
Project Details
Apartment area
29,3 - 88,83 m²
Number of rooms
1-4
Number of floors
7
Completion date
Buildings completed
Construction Phases
Start przedsprzedaży
Przedprzedaż mieszkań ruszyła w kwietniu 2019r.
Construction start
Once legal requirements are fulfilled, inspections completed, and design documentation prepared, construction of your new apartment begins. During this stage, the construction site is prepared, building outlines are marked, and excavation for the foundations begins.
‘Zero state’
Moment, w którym budynek „wychodzi z ziemi”. Każdego dnia będzie można przyglądać się postępom prac i dynamicznemu przyrostowi kolejnych kondygnacji. Następuje wylewka betonu, deskowanie oraz zbrojenie stropu.
Shell open stage
In this stage, the building structure and roofing are completed.
Shell closed stage
At this stage, windows have been installed, external walls constructed, and finishing works commence.
Occupancy permit
At this point, construction works on both the buildings and the surrounding grounds are complete. It is time for inspections conducted by, among others, the Fire Brigade, Health and Safety Authority, and the District Building Control Inspectorate (PINB). If there are no objections, the occupancy permit is issued.
Key handover
Time to move in! The process of handing over keys to future residents begins.