Warszawa, Mokotów, ul. Zdziechowskiego
Wybrane mieszkania z harmonogramem płatności 20/80
Numer / Dostępność | Pokoje ↑ ↓ | Powierzchnia ↑ ↓ | Floor ↑ ↓ | Dodatkowe informacje | Inwestycja | Plan mieszkania | Cena ↑ ↓ | |
---|---|---|---|---|---|---|---|---|
HB0102
Dostępne
|
3 | 69.75 m2 | 1 |
Balkon 17.06 m2 |
Holm House 5 | 1 749 000 zł 25 075 zł/m2 |
|
|
HB0103
Dostępne
|
1 | 36.42 m2 | 1 | --- | Holm House 5 | 1 045 000 zł 28 693 zł/m2 |
|
|
HB0107
Dostępne
|
3 | 62.67 m2 | 1 |
Balkon 11.06 m2 |
Holm House 5 | 1 643 000 zł 26 217 zł/m2 |
|
|
HB0109
Dostępne
|
1 | 29.15 m2 | 1 |
Balkon 6.33 m2 |
Holm House 5 | 863 000 zł 29 605 zł/m2 |
|
|
HB0202
Dostępne
|
3 | 69.93 m2 | 2 |
Balkon 17.06 m2 |
Holm House 5 | 1 771 000 zł 25 325 zł/m2 |
|
|
HB0203
Dostępne
|
1 | 36.48 m2 | 2 | --- | Holm House 5 | 1 056 000 zł 28 947 zł/m2 |
|
Holm House is a project that has been part of Mokotów's urban fabric for years. The main inspiration for the design of the fifth stage was an old oak tree located in the middle of the plot. The goal set for the Kulczyński Architekt design studio was to fit the building into the tree's surroundings and prepare the design so that it could be preserved.
The design of Holm House 5 relies on a modern form with clear geometric shapes, a contrast to the natural, irregular shape of the oak growing on the site. The connection between modernity and nature is to be made even by the finishing details – the copper-coloured upholstery of the balconies corresponds with the oak leaves, which take on this shade in autumn.
Project Details | |
---|---|
Powierzchnia mieszkań | 28 -108 m² |
Liczba pokoi | 1 - 5 |
Liczba pięter | 5 - 8 |
Commercial units | 4 |
Data ukończenia | Q4 2025 |
Holm House is located between Domaniewska and Mariana Zdziechowskiego streets, close to Wierzbno and Wilanowska subway stations. Nearby is the shopping mall Galeria Mokotów and a large recreational area – Arkadia Park by the Królikarnia Palace. The excellent infrastructure of this part of Warsaw, the proximity of the business district, and the use of innovative solutions in the buildings make living here the best investment.
Holm House in Warsaw is a project ultimately comprising eight buildings and more than 800 apartments. Six of the seven buildings at 4-11 Zdziechowskiego Street already have residents. Today, more than 700 families live here. The final stage of the project is currently under construction.
The Holm House development features a number of green solutions, including a rainwater harvesting tank and a greywater recovery system. The 5th stage of the project is located on a plot whose central spot is occupied by an approximately 150-year-old oak tree. Thanks to the efforts of the investor and designers, the tree was saved. Around the oak, a unique concept of a sustainable house was built, whose residents can live close to nature. The development also features animal-friendly solutions, such as bird drinkers and insect houses.
Skanska_Broszura_SzaraWoda
pobierzPowyższe informacje nie stanowią oferty handlowej w rozumieniu art. 66 § 1 Kodeksu Cywilnego.
Styczeń 2024
Zapraszamy do umówienia się na spotkanie w biurze sprzedaży.