The Mickiewicz Estate – a trustworthy housing estate in Warsaw

Osiedle Mickiewicza 03

Warsaw, Bielany/Żoliborz, 5B–5D Rudzka Street

Discover our offer

Send an enquiry
Hello, I’d like some information about the Mickiewicza 03 housing estate and similar developments. Please do get in touch.
+48 22 509 99 99 Mon–Fri 9.00 – 17.00

Number of rooms

Area

m2
m2
1 m2 207 m2

Price per m²

2,494 zł 38,816 zł

Price

962 zł 4,930,170 zł

Floor

Selected filters
Edit filters
All flats

No results

Description

Osiedle Mickiewicza 03

The third phase of the intimate, modern and functional Mickiewicza Estate comprises three buildings that are already occupied. The estate is situated in a green and peaceful part of Warsaw, on the border between Żoliborz and Old Bielany, close to parks and green spaces such as Keller Ponds, Żeromski Park, Kępa Potocka and Bielański Forest. The Słodowiec and Plac Wilsona metro stations are just a few minutes’ walk away, as are numerous tram and bus stops. A cycle path runs right beside the estate, connecting it to the city’s well-developed cycling infrastructure.

  • ​Bright, well-lit flats
  • Natural, safe finishing materials​
  • Large, triple-glazed windows
  • Ceiling height of the flat: approx. 2.72 m
  • Residents’ club – a comfortably furnished communal area in Building B
  • The first residential development in Poland to be awarded the BREEAM environmental certificate – all Skanska developments are now built in accordance with the principles of sustainable construction and in a way that enables economical, comfortable and responsible living
  • ‘Barrier-Free Facility’ certificate – the minimal number of kerbs and steps makes it easier to move around the estate, with threshold-free lift access and lightweight doors facilitating entry to the buildings; some flats could be adapted to suit people with various degrees and types of mobility, visual or hearing impairments

 

Project Details
Apartment area 116.83 m²
Number of rooms 4
Number of floors 6
Completion date Buildings completed

Construction Phases

Sales launch

Sales of flats began in August 2018.

Construction start

Once the legal requirements have been met, inspections carried out and the design documentation finalised, construction of your new flat begins. At this stage, the building site is prepared, the building lines are marked out and we start excavating for the foundations.

‘Zero state’

The moment when the building ‘rises from the ground’. Every day, you’ll be able to watch the work progress and see the floors being added at a rapid pace. Concrete is being poured, and the formwork and reinforcement for the floor slab are being installed.

Open-plan shell

At this stage, we are constructing the buildings and fitting their roofs.

Shell closed stage

At this stage, windows have been installed, external walls constructed, and finishing works commence.

Occupancy permit

At this stage, the works on both the buildings and the surrounding area have been completed. It is now time for inspections to be carried out by, amongst others, the Fire Service, the Sanitary and Epidemiological Station and the District Building Control Inspectorate (PINB). If there are no objections, an occupation permit is issued.

Key handover

Time to move in! The process of handing over keys to future residents begins.
Location
Filter map
Clear filters

Send an enquiry

    Thank you for your interest in our offer. Please get in touch – we’ll be happy to answer any questions you may have.

    Enquiry details:

    Add items from your Favourites to your enquiry:






    Enquiry sent!

    Thank you, we have received your enquiry. One of our advisers will contact you via the email address or telephone number you have provided.

    OK

    Sales office

    Home Center in the Spark office block

    173 Solidarności Avenue, Warsaw

    Mon–Fri 10.00–17.00

    Send an enquiry